
Ramirent at Grape 2025
This year, too, Ramirent contributed to the preparations for the Grape festival at the Trenčín airport.

Tunnel Višňové
Ramirent provided technical support in the form of machine rental during construction work on the longest tunnel in Slovakia.

Big Summer Fest 2025
For Big Summer Fest 2025, Ramirent provided the technical infrastructure necessary for the smooth running of the event so that visitors can enjoy an unforgettable summer experience.

CIBULA FEST 2025
Ramirent participated in the supply and implementation of the technical facilities at the Holíč Airport area during the Cibula Fest.

Pohoda festival 2025
At Trenčín Airport, Ramirent provided behind-the-scenes technical solutions that helped prepare for the Pohoda 2025 festival.

Project Vaillant – Senica 2022 – 2024

The reconstruction of the Sitno Forest Resort
A Ramirent cargo construction elevator was used in the reconstruction of the Sitno Forest Resort hotel.

Volvo Valaliky

ACDC Tour 2024
AC/DC Power UP Tour 2024 - the biggest concert in the history of SlovakiaRamirent employees and our technology have been involved for several weeks to ensure that visitors have a spectacular experience.And it succeeded!www.ramirent.sk